Operating
Get your geothermal system up and running - and keep it operating efficiently. Testing After checking the ground heat exchanger for tightness, installers should follow these testing steps. Checkout Procedure After installation, flushing and testing - and prior to operation - the geothermal heat pump system should be evaluated using a checkout procedure. Performance Ratings Most manufacturers publish performance ratings on their various models, including loop certifications. Maintenance These periodic maintenance procedures should be performed at regular intervals.
|